Substation Scout

Stink Run - Sundial substation interconnection queue

2 active projects totaling 98 MW in the PJM queue.

2 PJM queue filings name Stink Run - Sundial as the point of interconnection, all in WV.

Target commercial operation dates as filed run from Dec 2028 to Dec 2030 (2 filings). 2 active filings target a date after November 27, 2026.

Transmission owner as filed: AEP (2 filings).

2active projects
98active MW
2total filed
Queue IDProjectkVMWResourceStatusTarget COD
C01-1669 Stink Run - Sundial 138 kV 138 50 Battery Active Dec 2030
AG2-568 Stink Run - Sundial 138 kV 138 48 Solar Active Dec 2028

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.

Other PJM queue substations in Boone County, WV

No other substation in Boone County, WV is named as a point of interconnection in the PJM queue.

All 2 PJM queue filings in Boone County, WV.

Other PJM queue substations in Not Specified County, WV

No other substation in Not Specified County, WV is named as a point of interconnection in the PJM queue.

All 1 PJM queue filings in Not Specified County, WV.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first