Not Specified, WV interconnection queue
1 active project totaling 48 MW in the PJM queue.
1active projects
48active MW
1total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| AG2-568 | Stink Run - Sundial 138 kV | 138 | 48 | Solar | Active |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.
Site Scanner