Substation Scout

Scottsville-Colleen substation interconnection queue

0 active projects totalling 0 MW in the PJM queue, plus 3 with terminal status (shown greyed).

0active projects
0active MW
3total filed
Queue IDProjectkVMWResourceStatus
AF1-323 Scottsville-Colleen 138 kV 138 33 Solar Withdrawn
AF2-302 Scottsville-Colleen 138 kV 138 12 Solar Withdrawn
AG1-022 Scottsville-Colleen 138 kV 138 12 Solar Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.