Mount Eagle substation interconnection queue
0 active projects totalling 0 MW in the PJM queue, plus 3 with terminal status (shown greyed).
0active projects
0active MW
3total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| AI1-125 | Mount Eagle 34.5 kV | 34.5 | 13.2 | Solar | Withdrawn |
| AC1-116 | Rivanna Solar | 34.5 | 4.7 | Solar | Withdrawn |
| AD1-040 | Mount Eagle 34.5 kV | 34.5 | 4.2 | Solar | Withdrawn |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.