Albemarle, VA interconnection queue
1 active project totalling 82.8 MW in the PJM queue, plus 7 with terminal status (shown greyed).
1active projects
82.8active MW
8total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| AE2-092 | Woodridge Solar | 115 | 82.8 | Solar | Engineering and Procurement |
| AF1-323 | Scottsville-Colleen 138 kV | 138 | 33 | Solar | Withdrawn |
| AH2-092 | Kidds Store-Sherwood 115 kV | 115 | 32 | Battery | Withdrawn |
| AI1-125 | Mount Eagle 34.5 kV | 34.5 | 13.2 | Solar | Withdrawn |
| AF2-302 | Scottsville-Colleen 138 kV | 138 | 12 | Solar | Withdrawn |
| AG1-022 | Scottsville-Colleen 138 kV | 138 | 12 | Solar | Withdrawn |
| AC1-116 | Rivanna Solar | 34.5 | 4.7 | Solar | Withdrawn |
| AD1-040 | Mount Eagle 34.5 kV | 34.5 | 4.2 | Solar | Withdrawn |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.