Substation Scout

Albemarle, VA interconnection queue

1 active project totalling 82.8 MW in the PJM queue, plus 7 with terminal status (shown greyed).

1active projects
82.8active MW
8total filed
Queue IDProjectkVMWResourceStatus
AE2-092 Woodridge Solar 115 82.8 Solar Engineering and Procurement
AF1-323 Scottsville-Colleen 138 kV 138 33 Solar Withdrawn
AH2-092 Kidds Store-Sherwood 115 kV 115 32 Battery Withdrawn
AI1-125 Mount Eagle 34.5 kV 34.5 13.2 Solar Withdrawn
AF2-302 Scottsville-Colleen 138 kV 138 12 Solar Withdrawn
AG1-022 Scottsville-Colleen 138 kV 138 12 Solar Withdrawn
AC1-116 Rivanna Solar 34.5 4.7 Solar Withdrawn
AD1-040 Mount Eagle 34.5 kV 34.5 4.2 Solar Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.