Mount Airy - Wythe substation interconnection queue
1 active project totaling 110.6 MW in the PJM queue, plus 1 with terminal status (shown grayed).
2 PJM queue filings name Mount Airy - Wythe as the point of interconnection, all in Wythe County, VA.
Target commercial operation dates as filed run from Dec 2023 to Dec 2029 (2 filings). 1 active filing targets a date after November 27, 2026.
Transmission owner as filed: AEP (1 filing).
1active projects
110.6active MW
2total filed
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| C01-1984 | Mount Airy - Wythe 138 kV | 138 | 110.6 | Solar | Active | Dec 2029 |
| AG2-432 | Mount Airy - Wythe 138 kV | 138 | 30 | Solar | Withdrawn | Dec 2023 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.