Henry, OH interconnection queue
2 active projects totalling 56.4 MW in the PJM queue, plus 9 with terminal status (shown greyed).
2active projects
56.4active MW
11total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| AG2-358 | Midway 345 kV | 345 | 300 | Battery | Withdrawn |
| AH2-215 | Midway 138 kV | 138 | 120 | Solar | Withdrawn |
| AH2-220 | Midway 138 kV | 138 | 100 | Battery | Withdrawn |
| AG2-514 | Midway 345 kV II | 345 | 90 | Solar | Withdrawn |
| AH2-288 | Napoleon Muni 138 kV | 138 | 82.4 | Battery | Withdrawn |
| AH1-315 | Maroe 69 kV | 69 | 57.6 | Solar | Withdrawn |
| AG2-336 | Midway 138 kV | 138 | 48 | Solar | Withdrawn |
| AG1-319 | Napoleon Muni 138 kV | 138 | 39 | Solar | Withdrawn |
| C01-1358 | Sullivan - Stryker 138 kV | 138 | 32.4 | Solar | Active |
| AF1-205 | Henry County Solar | 138 | 24 | Solar | Suspended |
| AG2-337 | Midway 138 kV II | 138 | 12 | Solar | Withdrawn |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.