JK Smith substation interconnection queue
0 active projects totalling 0 MW in the PJM queue, plus 4 with terminal status (shown greyed).
0active projects
0active MW
4total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| AB2-054 | JK Smith 345kV | 345 | 504 | Gas | Withdrawn |
| Z2-084 | JK Smith 345kV | 345 | 207.8 | Gas | Withdrawn |
| Y1-039A_EKPC1 | JK Smith 138 KV | 138 | 170 | Gas | Withdrawn |
| AD1-134 | JK Smith 138 kV | 138 | 72.9 | Gas | Withdrawn |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.