Clark, KY interconnection queue
0 active projects totalling 0 MW in the PJM queue, plus 6 with terminal status (shown greyed).
0active projects
0active MW
6total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| AB2-054 | JK Smith 345kV | 345 | 504 | Gas | Withdrawn |
| AF1-070 | North Clark 345 kV | 345 | 255.3 | Hybrid | Withdrawn |
| Y1-039A_EKPC1 | JK Smith 138 KV | 138 | 170 | Gas | Withdrawn |
| AF1-251 | Avon-North Clark 345 kV | 345 | 132 | Hybrid | Withdrawn |
| AE2-138 | Avon-North Clark 345 kV | 345 | 20.8 | Solar | Withdrawn |
| AE2-210 | Avon-North Clark 345 kV | 345 | 7.2 | Solar | Withdrawn |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.