Nelson, KY interconnection queue
0 active projects totalling 0 MW in the PJM queue, plus 2 with terminal status (shown greyed).
0active projects
0active MW
2total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| Z2-084 | JK Smith 345kV | 345 | 207.8 | Gas | Withdrawn |
| AH1-281 | Bluegrass Parkway Tap - Woodlawn 69 kV | 69 | 12 | Solar | Withdrawn |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.