Substation Scout

Nelson, KY interconnection queue

0 active projects totalling 0 MW in the PJM queue, plus 2 with terminal status (shown greyed).

0active projects
0active MW
2total filed
Queue IDProjectkVMWResourceStatus
Z2-084 JK Smith 345kV 345 207.8 Gas Withdrawn
AH1-281 Bluegrass Parkway Tap - Woodlawn 69 kV 69 12 Solar Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.