Substation Scout

Hannibal substation interconnection queue

1 active project totalling 20 MW in the PJM queue, plus 1 with terminal status (shown greyed).

1active projects
20active MW
2total filed
Queue IDProjectkVMWResourceStatus
AH1-704 Hannibal 138 kV 138 20 Gas Active
AH2-111 Hannibal 138 kV 138 20 Gas Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.