Substation Scout

Monroe, OH interconnection queue

2 active projects totaling 505 MW in the PJM queue, plus 1 with terminal status (shown grayed).

2active projects
505active MW
3total filed
Queue IDProjectkVMWResourceStatus
AB2-093 Hannibal Port Power Project 138 485 Gas In Service
AH1-704 Hannibal 138 kV 138 20 Gas Active
AH2-111 Hannibal 138 kV 138 20 Gas Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first