GR RIDGE ; B 138 kV
PJM queue ID C01-1181
GR RIDGE ; B 138 kV (C01-1181) is listed in the PJM interconnection queue as a 6.2 MW wind project in LaSalle County, IL. The filing names GR RIDGE ; B as its point of interconnection. PJM lists its status as “Active”, with a target commercial operation date of April 24, 2028.
| Queue ID | C01-1181 |
|---|---|
| Project name | GR RIDGE ; B 138 kV |
| Status (as published) | Active |
| Substation | GR RIDGE ; B |
| Point of interconnection | GR RIDGE ; B 138 kV |
| County | LaSalle |
| State | IL |
| Voltage | 138 kV |
| Capacity | 6.2 MW |
| Resource (as published) | Wind |
| Resource category | Wind (normalized for filtering) |
| Target commercial operation | 2028-04-24 |
| Source dataset | cycle |
Same substation and county
GR RIDGE ; B substation: 2 requests in the PJM queue, 2 active totaling 42.7 MW.
| Queue ID | Project | MW | Resource | Status |
|---|---|---|---|---|
| C01-1177 | GR RIDGE ; B 138 kV | 36.5 | Wind | Active |
LaSalle, IL: 5 requests in the PJM queue, 4 active totaling 559.5 MW.
Tracked changes
No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →
Additional filed fields
| Developer | Grand Ridge Energy IV LLC |
|---|---|
| Transmission owner | ComEd |
| Project type | Generation Interconnection |
| Cycle | C01 |
| Stage | Phase 1 |
| MW energy | 0.0 |
| MW capacity | 6.16 |
| MFO | 107.2 |
| Submitted date | 4/27/2026 |
| Last updated | 6/22/2026 |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.