Gosport substation interconnection queue
0 active projects totalling 0 MW in the PJM queue, plus 5 with terminal status (shown greyed).
0active projects
0active MW
5total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| Y2-001 | SPSA Navy Power Plant | n/r | 40 | Other | Deactivated |
| Q32 | Gosport | 115 | 30 | Other | Withdrawn |
| AE1-152 | Gosport 34.5 kV | 34.5 | 20.2 | Hybrid | Withdrawn |
| Q64 | Gosport 115kV | 115 | 20 | Other | Withdrawn |
| T104 | SPSA Navy Power Plant | 115 | 20 | Other | Deactivated |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.