Ft. Martin - Kammer substation interconnection queue
1 active project totalling 100 MW in the PJM queue, plus 1 with terminal status (shown greyed).
1active projects
100active MW
2total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| Q79 | Longview ST1 | 500 | 100 | Coal | In Service |
| Q80 | Ft. Martin - Kammer 500kV | 500 | 100 | Gas | Withdrawn |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.