Ft. Martin - Kammer substation interconnection queue
1 active project totaling 100 MW in the PJM queue, plus 1 with terminal status (shown grayed).
2 PJM queue filings name Ft. Martin - Kammer as the point of interconnection, all in Monongalia County, WV.
Target commercial operation dates as filed run from Apr 2011 to Aug 2012 (2 filings).
1active projects
100active MW
2total filed
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| Q79 | Longview ST1 | 500 | 100 | Coal | In Service | Apr 2011 |
| Q80 | Ft. Martin - Kammer 500kV | 500 | 100 | Gas | Withdrawn | Aug 2012 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.
Other PJM queue substations in Monongalia County, WV
- Fort Martin: 2 active, 1,613.5 MW of 3 filed
- North Longview: 2 active, 1,245 MW of 4 filed
Site Scanner