Fort Martin substation interconnection queue
2 active projects totaling 1,613.5 MW in the PJM queue, plus 1 with terminal status (shown grayed).
3 PJM queue filings name Fort Martin as the point of interconnection, all in Monongalia County, WV.
Target commercial operation dates as filed run from Jun 2005 to Dec 2031 (3 filings). 1 active filing targets a date after November 27, 2026.
Transmission owner as filed: APS (1 filing).
2active projects
1,613.5active MW
3total filed
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| C01-1143 | Fort Martin 500 kV | 500 | 1,013.5 | Gas | Active | Dec 2031 |
| G30_W51 | Longview ST1 | 500 | 600 | Coal | In Service | Apr 2011 |
| G06_W44 | Fort Martin 500 kV | 500 | 500 | Gas | Withdrawn | Jun 2005 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.
Other PJM queue substations in Monongalia County, WV
- North Longview: 2 active, 1,245 MW of 4 filed
- Ft. Martin - Kammer: 1 active, 100 MW of 2 filed
Site Scanner