Friendship Manor substation interconnection queue

1 active project totalling 1 MW in the PJM queue, plus 1 with terminal status (shown greyed).

1active projects
1active MW
2total filed
Queue IDProjectkVMWResourceStatus
V4-038 Alpha Ridge Landfill 34.5 1 Gas In Service
Y1-045 Friendship Manor n/r 0 Solar Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.