Substation Scout

Howard, MD interconnection queue

0 active projects totalling 0 MW in the PJM queue, plus 13 with terminal status (shown greyed).

0active projects
0active MW
13total filed
Queue IDProjectkVMWResourceStatus
AA1-081 Cooksville 13kV 13 2 Solar Withdrawn
AB2-123 Whiterock 34kV 34 1.9 Solar Withdrawn
AB2-124 Whiterock 34kV 34 1.9 Solar Withdrawn
AE2-070 White Rock 34 kV 34 1.7 Solar Withdrawn
V3-002 Ellicott City n/r 0.5 Solar Withdrawn
AB1-036 Howard 240v n/r 0 Battery Withdrawn
AB1-040 Glendale 240v n/r 0 Battery Withdrawn
AB1-044 Highland 240v n/r 0 Battery Withdrawn
AB1-047 Highland 240v n/r 0 Battery Withdrawn
AB1-049 Friendship Manor 240v n/r 0 Battery Withdrawn
AB1-050 High Ridge 240v n/r 0 Battery Withdrawn
W4-030 Jessup n/r 0 Solar Withdrawn
Y1-045 Friendship Manor n/r 0 Solar Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.