Carroll, MD interconnection queue
3 active projects totalling 9.1 MW in the PJM queue, plus 1 with terminal status (shown greyed).
3active projects
9.1active MW
4total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| C01-2251 | Westminster 115 kV | 115 | 5 | Battery | Active |
| AB1-096 | Union Bridge Solar Facility | 34.5 | 3.1 | Solar | In Service |
| V4-038 | Alpha Ridge Landfill | 34.5 | 1 | Gas | In Service |
| AC1-031 | Hampstead 13 kV | 13 | 0.7 | Solar | Withdrawn |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.