Engle substation interconnection queue
0 active projects totalling 0 MW in the PJM queue, plus 4 with terminal status (shown greyed).
0active projects
0active MW
4total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| W4-039 | Engle 69kV | 69 | 62.5 | Other | Withdrawn |
| Y2-086 | Engle 69kV | 69 | 62.5 | Other | Withdrawn |
| V3-055 | Engle 69kV | 69 | 50 | Other | Withdrawn |
| W2-062 | Engle 69kV | 69 | 12.1 | Other | Withdrawn |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.