Engle substation interconnection queue

0 active projects totalling 0 MW in the PJM queue, plus 4 with terminal status (shown greyed).

0active projects
0active MW
4total filed
Queue IDProjectkVMWResourceStatus
W4-039 Engle 69kV 69 62.5 Other Withdrawn
Y2-086 Engle 69kV 69 62.5 Other Withdrawn
V3-055 Engle 69kV 69 50 Other Withdrawn
W2-062 Engle 69kV 69 12.1 Other Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.