Substation Scout

Perry, KY interconnection queue

1 active project totalling 48 MW in the PJM queue, plus 10 with terminal status (shown greyed).

1active projects
48active MW
11total filed
Queue IDProjectkVMWResourceStatus
O69 Beaver Creek-Hazard 138kV 138 535 Coal Withdrawn
AG2-681 Soft Shell - Bonny Man 138 kV 138 90 Solar Withdrawn
W4-039 Engle 69kV 69 62.5 Other Withdrawn
Y2-086 Engle 69kV 69 62.5 Other Withdrawn
V3-055 Engle 69kV 69 50 Other Withdrawn
AH2-076 Bonneyman - Softshell 138 kV 138 48.2 Hybrid Withdrawn
AG1-066 Bright Mountain Solar 69 48 Solar Engineering and Procurement
AD2-106 Bulan 69kV 69 33.6 Solar Withdrawn
AE2-208 Chavies-Bonnyman 69 kV 69 25 Battery Withdrawn
AD2-107 Chavies-Bonnyman 69kV 69 23.1 Solar Withdrawn
W2-062 Engle 69kV 69 12.1 Other Withdrawn