Perry, KY interconnection queue
1 active project totalling 48 MW in the PJM queue, plus 10 with terminal status (shown greyed).
1active projects
48active MW
11total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| O69 | Beaver Creek-Hazard 138kV | 138 | 535 | Coal | Withdrawn |
| AG2-681 | Soft Shell - Bonny Man 138 kV | 138 | 90 | Solar | Withdrawn |
| W4-039 | Engle 69kV | 69 | 62.5 | Other | Withdrawn |
| Y2-086 | Engle 69kV | 69 | 62.5 | Other | Withdrawn |
| V3-055 | Engle 69kV | 69 | 50 | Other | Withdrawn |
| AH2-076 | Bonneyman - Softshell 138 kV | 138 | 48.2 | Hybrid | Withdrawn |
| AG1-066 | Bright Mountain Solar | 69 | 48 | Solar | Engineering and Procurement |
| AD2-106 | Bulan 69kV | 69 | 33.6 | Solar | Withdrawn |
| AE2-208 | Chavies-Bonnyman 69 kV | 69 | 25 | Battery | Withdrawn |
| AD2-107 | Chavies-Bonnyman 69kV | 69 | 23.1 | Solar | Withdrawn |
| W2-062 | Engle 69kV | 69 | 12.1 | Other | Withdrawn |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.