Chavies-Bonnyman substation interconnection queue

0 active projects totalling 0 MW in the PJM queue, plus 2 with terminal status (shown greyed).

0active projects
0active MW
2total filed
Queue IDProjectkVMWResourceStatus
AE2-208 Chavies-Bonnyman 69 kV 69 25 Battery Withdrawn
AD2-107 Chavies-Bonnyman 69kV 69 23.1 Solar Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.