Chavies-Bonnyman substation interconnection queue

0 active projects totalling 0 MW in the PJM queue, plus 2 with terminal status (shown greyed).

0active projects
0active MW
2total filed
Queue IDProjectkVMWResourceStatus
AE2-208 Chavies-Bonnyman 69 kV 69 25 Battery Withdrawn
AD2-107 Chavies-Bonnyman 69kV 69 23.1 Solar Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.