Substation Scout

Eldean substation interconnection queue

0 active projects totaling 0 MW in the PJM queue, plus 3 with terminal status (shown grayed).

3 PJM queue filings name Eldean as the point of interconnection, all in Miami County, OH.

Target commercial operation dates as filed run from Dec 2024 to Dec 2027 (3 filings).

Transmission owner as filed: Dayton (1 filing).

0active projects
0active MW
3total filed
Queue IDProjectkVMWResourceStatusTarget COD
AE2-218 Eldean Solar 138 106 Solar Withdrawn Dec 2024
AH1-321 Eldean 138 kV 138 54 Battery Withdrawn Dec 2025
AI2-159 Eldean 138 kV 138 43.5 Solar Withdrawn Dec 2027

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.

PJM planning mentions

A substation with the same name is named in PJM transmission planning materials: Eldean (DAYTON, 4 mentions).

Same name and transmission owner. Matched on name and transmission owner: the utility that presented this substation in PJM planning materials is the transmission owner recorded on the queue filings at a substation of the same name. Not verified as the same facility.

Other PJM queue substations in Miami County, OH

No other substation in Miami County, OH is named as a point of interconnection in the PJM queue.

All 8 PJM queue filings in Miami County, OH.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first