Eldean substation interconnection queue

0 active projects totalling 0 MW in the PJM queue, plus 3 with terminal status (shown greyed).

0active projects
0active MW
3total filed
Queue IDProjectkVMWResourceStatus
AE2-218 Eldean Solar 138 106 Solar Withdrawn
AH1-321 Eldean 138 kV 138 54 Battery Withdrawn
AI2-159 Eldean 138 kV 138 43.5 Solar Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.