Substation Scout

Miami, OH interconnection queue

0 active projects totalling 0 MW in the PJM queue, plus 8 with terminal status (shown greyed).

0active projects
0active MW
8total filed
Queue IDProjectkVMWResourceStatus
AG2-628 Spring Creek - Millcreek 138 kV 138 120 Solar Withdrawn
AH2-216 Not reported n/r 120 Solar Withdrawn
AE2-218 Eldean Solar 138 106 Solar Withdrawn
AH2-221 Not reported n/r 100 Battery Withdrawn
AH1-322 Fostoria Central - Lemoyne 345 kV 345 90 Battery Withdrawn
AH1-321 Eldean 138 kV 138 54 Battery Withdrawn
AI2-159 Eldean 138 kV 138 43.5 Solar Withdrawn
W3-013 Miami n/r 39 Wind Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.