Clifford substation interconnection queue

1 active project totalling 50 MW in the PJM queue, plus 1 with terminal status (shown greyed).

1active projects
50active MW
2total filed
Queue IDProjectkVMWResourceStatus
C01-1666 Clifford 138 kV 138 50 Battery Active
AF2-107 Amherst Solar 138 32.3 Solar Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.