Clifford substation interconnection queue
1 active project totaling 50 MW in the PJM queue, plus 1 with terminal status (shown grayed).
2 PJM queue filings name Clifford as the point of interconnection, all in Amherst County, VA.
Target commercial operation dates as filed run from Dec 2028 to Dec 2030 (2 filings). 1 active filing targets a date after November 27, 2026.
Transmission owner as filed: AEP (1 filing).
1active projects
50active MW
2total filed
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| C01-1666 | Clifford 138 kV | 138 | 50 | Battery | Active | Dec 2030 |
| AF2-107 | Amherst Solar | 138 | 32.3 | Solar | Withdrawn | Dec 2028 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.