Clifford substation interconnection queue
1 active project totalling 50 MW in the PJM queue, plus 1 with terminal status (shown greyed).
1active projects
50active MW
2total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| C01-1666 | Clifford 138 kV | 138 | 50 | Battery | Active |
| AF2-107 | Amherst Solar | 138 | 32.3 | Solar | Withdrawn |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.