Amherst, VA interconnection queue
2 active projects totalling 51.8 MW in the PJM queue, plus 8 with terminal status (shown greyed).
2active projects
51.8active MW
10total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| C01-1666 | Clifford 138 kV | 138 | 50 | Battery | Active |
| AG1-123 | Amherst 69 kV | 69 | 38.5 | Solar | Withdrawn |
| AG2-187 | Amherst-Riverville 138 kV | 138 | 33.2 | Battery | Withdrawn |
| AF2-107 | Amherst Solar | 138 | 32.3 | Solar | Withdrawn |
| AI2-227 | Boxwood-Riverville 138 kV | 138 | 30 | Battery | Withdrawn |
| AG2-605 | Skimmer - Abert 69 kV | 69 | 24.8 | Hybrid | Withdrawn |
| AG1-494 | Mainspring Grid | 138 | 20 | Battery | Withdrawn |
| AI2-345 | Amherst-Riverville138 kV | 138 | 18 | Solar | Withdrawn |
| AH2-137 | Monroe - Coolwell 12.47 kV | 12.5 | 6 | Solar | Withdrawn |
| C01-1254 | Coolwell Switch - Wallon 12.47 kV | 12.5 | 1.8 | Solar | Active |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.