Substation Scout

Boxwood-Riverville substation interconnection queue

0 active projects totalling 0 MW in the PJM queue, plus 2 with terminal status (shown greyed).

0active projects
0active MW
2total filed
Queue IDProjectkVMWResourceStatus
AI2-227 Boxwood-Riverville 138 kV 138 30 Battery Withdrawn
AG1-494 Mainspring Grid 138 20 Battery Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.