Central Hardin substation interconnection queue

0 active projects totalling 0 MW in the PJM queue, plus 4 with terminal status (shown greyed).

0active projects
0active MW
4total filed
Queue IDProjectkVMWResourceStatus
AH1-016 Central Hardin 138 kV 138 108 Solar Withdrawn
AF2-090 Central Hardin 138 kV 138 73.6 Solar Withdrawn
AF2-391 Central Hardin 69 kV 69 72 Hybrid Withdrawn
AG1-491 Central Hardin 69 kV 69 42 Hybrid Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.