Central Hardin-Stephensburg substation interconnection queue

0 active projects totalling 0 MW in the PJM queue, plus 3 with terminal status (shown greyed).

0active projects
0active MW
3total filed
Queue IDProjectkVMWResourceStatus
AF2-309 Central Hardin-Stephensburg 69 kV 69 42 Solar Withdrawn
AF2-308 Central Hardin-Stephensburg 69 kV 69 28 Battery Withdrawn
AI2-376 Central Hardin-Stephensburg 69 kV 69 21.8 Solar Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.