Hardin, KY interconnection queue

1 active project totalling 54.8 MW in the PJM queue, plus 13 with terminal status (shown greyed).

1active projects
54.8active MW
14total filed
Queue IDProjectkVMWResourceStatus
AH1-016 Central Hardin 138 kV 138 108 Solar Withdrawn
AF2-090 Central Hardin 138 kV 138 73.6 Solar Withdrawn
AF2-391 Central Hardin 69 kV 69 72 Hybrid Withdrawn
AG1-320 Stonecrop Solar 69 54.8 Solar EP
AF2-260 Stephensburg-Central Hardin 69 kV 69 53 Solar Withdrawn
AF2-309 Central Hardin-Stephensburg 69 kV 69 42 Solar Withdrawn
AG1-491 Central Hardin 69 kV 69 42 Hybrid Withdrawn
AF2-246 Stephensburg 69 kV 69 38.7 Solar Withdrawn
AG1-096 Rineyville 69 kV 69 36.7 Hybrid Withdrawn
AG2-183 Not reported n/r 30 Solar Withdrawn
AF2-308 Central Hardin-Stephensburg 69 kV 69 28 Battery Withdrawn
AG2-549 Rineyville 69 kV 69 26.7 Solar Withdrawn
AI2-376 Central Hardin-Stephensburg 69 kV 69 21.8 Solar Withdrawn
AG2-662 Stephensburg - Central Hardin 69 kV 69 0 Battery Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.