Brookside-Cloverdale substation interconnection queue
1 active project totaling 78 MW in the PJM queue, plus 1 with terminal status (shown grayed).
2 PJM queue filings name Brookside-Cloverdale as the point of interconnection, all in OH.
Target commercial operation dates as filed run from Dec 2013 to Nov 2028 (2 filings). 1 active filing targets a date after November 27, 2026.
1active projects
78active MW
2total filed
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| AF2-187 | Canal Road | 138 | 78 | Solar | Engineering and Procurement | Nov 2028 |
| X2-039 | Brookside-Cloverdale 138kV | 138 | 13 | Wind | Withdrawn | Dec 2013 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.
Other PJM queue substations in Wayne County, OH
- Brookside-Cloverdale II: none active of 2 filed
- Clutch: none active of 2 filed
Other PJM queue substations in Ashland County, OH
- Jerome - Mohicanville: none active of 2 filed
- LM Troy: none active of 2 filed