Brookside-Cloverdale II substation interconnection queue
0 active projects totaling 0 MW in the PJM queue, plus 2 with terminal status (shown grayed).
2 PJM queue filings name Brookside-Cloverdale II as the point of interconnection, all in Wayne County, OH.
Target commercial operation dates as filed run from Sep 2023 to Dec 2026 (2 filings).
0active projects
0active MW
2total filed
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| AH1-485 | Brookside-Cloverdale 138 kV II | 138 | 98 | Solar | Withdrawn | Sep 2023 |
| AI2-290 | Brookside-Cloverdale 138 kV II | 138 | 9.1 | Solar | Withdrawn | Dec 2026 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.
Other PJM queue substations in Wayne County, OH
- Brookside-Cloverdale: 1 active, 78 MW of 2 filed
- Clutch: none active of 2 filed