Ashland, OH interconnection queue
0 active projects totalling 0 MW in the PJM queue, plus 5 with terminal status (shown greyed).
0active projects
0active MW
5total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| AH1-598 | LM Troy 138 kV | 138 | 110 | Battery | Withdrawn |
| AH1-597 | LM Troy 138 kV | 138 | 70.8 | Solar | Withdrawn |
| X2-039 | Brookside-Cloverdale 138kV | 138 | 13 | Wind | Withdrawn |
| AH1-069 | Jerome - Mohicanville 69 kV | 69 | 10.2 | Solar | Withdrawn |
| AH1-070 | Jerome - Mohicanville 69 kV | 69 | 10.2 | Solar | Withdrawn |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.