Broadford substation interconnection queue

2 active projects totaling 625 MW in the PJM queue, plus 1 with terminal status (shown grayed).

3 PJM queue filings name Broadford as the point of interconnection, all in Smyth County, VA.

Target commercial operation dates as filed run from Oct 2025 to Mar 2032 (3 filings). 2 active filings target a date after November 27, 2026.

Transmission owner as filed: AEP (2 filings).

2active projects
625active MW
3total filed
Queue IDProjectkVMWResourceStatusTarget COD
C01-1842 Broadford 138 kV 138 375 Battery Active Mar 2032
AG2-360 Broadford 138 kV 138 250 Battery Active Dec 2029
AG2-597 Broadford 138 kV 138 120 Hybrid Withdrawn Oct 2025

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.

PJM planning mentions

A substation with the same name is named in PJM transmission planning materials: Broadford (AEP, 1 mention).

Same name and transmission owner. Matched on name and transmission owner: the utility that presented this substation in PJM planning materials is the transmission owner recorded on the queue filings at a substation of the same name. Not verified as the same facility.

Same name on other Substation Scout pages

Other sources that print a substation named “Broadford” in VA. They are matched by name and state only, so a page listed here may describe a different substation with the same name. Check the location and utility on each. Where a PJM planning record prints no state, the match is by name within the states the utility zone serves, which is weaker.

Other PJM queue substations in Smyth County, VA

No other substation in Smyth County, VA is named as a point of interconnection in the PJM queue.

All 6 PJM queue filings in Smyth County, VA.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first