Smyth, VA interconnection queue

2 active projects totalling 625 MW in the PJM queue, plus 4 with terminal status (shown greyed).

2active projects
625active MW
6total filed
Queue IDProjectkVMWResourceStatus
C01-1842 Broadford 138 kV 138 375 Battery Active
AG2-360 Broadford 138 kV 138 250 Battery Active
AG2-597 Broadford 138 kV 138 120 Hybrid Withdrawn
AG1-314 Rural Retreat 138 kV 138 100 Battery Withdrawn
AB2-010 Saltville-Holston 34.5kV Solar Facility 34.5 2.5 Solar Withdrawn
AB2-011 Saltville-Holston 34.5kV Solar Facility 34.5 2.5 Solar Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.