Hagerstown Plant
PJM queue ID AB2-097
Hagerstown Plant (AB2-097) is listed in the PJM interconnection queue as a solar request filed at 0 MW (a net change or energy-only filing) in Washington County, MD. The filing names Antietam as its point of interconnection. PJM lists its status as “In Service”, with a target commercial operation date of February 28, 2020.
| Queue ID | AB2-097 |
|---|---|
| Project name | Hagerstown Plant |
| Status (as published) | In Service |
| Substation | Antietam |
| Point of interconnection | Antietam 34.5kV |
| County | Washington |
| State | MD |
| Voltage | 34.5 kV |
| Capacity | 0 MW (0 MW as filed — net change or energy-only) |
| Resource (as published) | Solar |
| Resource category | Solar (normalized for filtering) |
| Target commercial operation | 2020-02-28 |
| Source dataset | serial |
Same substation and county
Antietam substation: 2 requests in the PJM queue, 1 active totaling 0 MW.
| Queue ID | Project | MW | Resource | Status |
|---|---|---|---|---|
| AA1-122 | Antietam 34.5kV | 3.8 | Solar | Withdrawn |
Washington, MD: 32 requests in the PJM queue, 5 active totaling 56 MW.
Tracked changes
No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →
Additional filed fields
| Project type | Generation Interconnection |
|---|---|
| MW energy | 10 |
| MW capacity | 0 |
| MFO | 10 |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.