Elizabeth City Solar Park
PJM queue ID Z2-027
Elizabeth City Solar Park (Z2-027) is listed in the PJM interconnection queue as a 14 MW solar project in Pasquotank County, NC. The filing names Pasquotank as its point of interconnection. PJM lists its status as “In Service”, with a target commercial operation date of February 15, 2015.
| Queue ID | Z2-027 |
|---|---|
| Project name | Elizabeth City Solar Park |
| Status (as published) | In Service |
| Substation | Pasquotank |
| Point of interconnection | Pasquotank 34.5kV |
| County | Pasquotank |
| State | NC |
| Voltage | 34.5 kV |
| Capacity | 14 MW |
| Resource (as published) | Solar |
| Resource category | Solar (normalized for filtering) |
| Target commercial operation | 2015-02-15 |
| Source dataset | serial |
Same substation and county
Pasquotank, NC: 5 requests in the PJM queue, 3 active totaling 48.6 MW.
Tracked changes
No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →
Additional filed fields
| Project type | Generation Interconnection |
|---|---|
| MW energy | 20 |
| MW capacity | 14 |
| MFO | 20 |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.