Glory Barn Road Generating Facility Alpaca (Z2-011) is listed in the PJM interconnection queue as a 19.9 MW gas project in Bradford County, PA. The filing names Canton as its point of interconnection. PJM lists its status as “In Service”, with a target commercial operation date of June 30, 2017.
| Queue ID | Z2-011 |
|---|---|
| Project name | Glory Barn Road Generating Facility Alpaca |
| Status (as published) | In Service |
| Substation | Canton |
| Point of interconnection | Canton 34.5kV |
| County | Bradford |
| State | PA |
| Voltage | 34.5 kV |
| Capacity | 19.9 MW |
| Resource (as published) | Natural Gas |
| Resource category | Gas (normalized for filtering) |
| Target commercial operation | 2017-06-30 |
| Source dataset | serial |
Same substation and county
Canton substation: 2 requests in the PJM queue, 2 active totaling 21 MW.
| Queue ID | Project | MW | Resource | Status |
|---|---|---|---|---|
| AD1-109 | Glory Barn Road Generating Facility Alpaca | 1.1 | Gas | In Service |
Bradford, PA: 52 requests in the PJM queue, 14 active totaling 913.4 MW.
Tracked changes
No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →
Additional filed fields
| Project type | Generation Interconnection |
|---|---|
| MW energy | 19.9 |
| MW capacity | 19.9 |
| MFO | 19.9 |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.