Glory Barn Road Generating Facility Alpaca

PJM queue ID AD1-109

Glory Barn Road Generating Facility Alpaca (AD1-109) is listed in the PJM interconnection queue as a 1.1 MW gas project in Bradford County, PA. The filing names Canton as its point of interconnection. PJM lists its status as “In Service”, with a target commercial operation date of July 9, 2018.

Queue IDAD1-109
Project nameGlory Barn Road Generating Facility Alpaca
Status (as published)In Service
SubstationCanton
Point of interconnectionCanton 34.5 kV
CountyBradford
StatePA
Voltage34.5 kV
Capacity1.1 MW
Resource (as published)Natural Gas
Resource categoryGas (normalized for filtering)
Target commercial operation2018-07-09
Source datasetserial

Same substation and county

Canton substation: 2 requests in the PJM queue, 2 active totaling 21 MW.

Queue IDProjectMWResourceStatus
Z2-011Glory Barn Road Generating Facility Alpaca19.9GasIn Service

Bradford, PA: 52 requests in the PJM queue, 14 active totaling 913.4 MW.

Tracked changes

No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →

Additional filed fields

Project typeGeneration Interconnection
MW energy1.1
MW capacity1.1
MFO21

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.