Substation Scout

Clinch River Power Plant

PJM queue ID Y3-040

Queue IDY3-040
Project nameClinch River Power Plant
Status (as published)In Service
SubstationClinch River Unit 2
Point of interconnectionClinch River Unit 2
CountyRussell
StateVA
VoltageNot reported
Capacity20 MW
Resource (as published)Natural Gas
Resource categoryGas (normalised for filtering)
Target commercial operation2016-06-06
Source datasetserial

Additional filed fields

Project TypeGeneration Interconnection
Mw Energy20
Mw Capacity20
Mfo250

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.