Substation Scout

French's Landfill Solar Farm

PJM queue ID Y2-051

French's Landfill Solar Farm (Y2-051) is listed in the PJM interconnection queue as a 1.9 MW solar project in Ocean County, NJ. The filing names Brick-Lane Mill as its point of interconnection. PJM lists its status as “In Service”, with a target commercial operation date of June 1, 2016.

Queue IDY2-051
Project nameFrench's Landfill Solar Farm
Status (as published)In Service
SubstationBrick-Lane Mill
Point of interconnectionBrick-Lane Mill 34.5kV
CountyOcean
StateNJ
Voltage34.5 kV
Capacity1.9 MW
Resource (as published)Solar
Resource categorySolar (normalized for filtering)
Target commercial operation2016-06-01
Source datasetserial

Same substation and county

Ocean, NJ: 55 requests in the PJM queue, 15 active totaling 653.1 MW.

Tracked changes

No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →

Additional filed fields

Project typeGeneration Interconnection
MW energy5
MW capacity1.9
MFO5

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first