Lakewood-Farmingdale Road Solar Farm
PJM queue ID W3-079
Lakewood-Farmingdale Road Solar Farm (W3-079) is listed in the PJM interconnection queue as a 2.6 MW solar project in Monmouth County, NJ. The filing names Allenwood-Larabee as its point of interconnection. PJM lists its status as “In Service”, with a target commercial operation date of October 6, 2016.
| Queue ID | W3-079 |
|---|---|
| Project name | Lakewood-Farmingdale Road Solar Farm |
| Status (as published) | In Service |
| Substation | Allenwood-Larabee |
| Point of interconnection | Allenwood-Larabee 34.5kV |
| County | Monmouth |
| State | NJ |
| Voltage | 34.5 kV |
| Capacity | 2.6 MW |
| Resource (as published) | Solar |
| Resource category | Solar (normalized for filtering) |
| Target commercial operation | 2016-10-06 |
| Source dataset | serial |
Same substation and county
Monmouth, NJ: 79 requests in the PJM queue, 18 active totaling 46.1 MW.
Tracked changes
No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →
Additional filed fields
| Project type | Generation Interconnection |
|---|---|
| MW energy | 7 |
| MW capacity | 2.6 |
| MFO | 7 |