Quakertown Solar Farm #1

PJM queue ID W3-003

Quakertown Solar Farm #1 (W3-003) is listed in the PJM interconnection queue as a solar request filed at 0 MW (a net change or energy-only filing) in Hunterdon County, NJ. The filing names East Flemington-Frenchtown as its point of interconnection. PJM lists its status as “In Service”, with a target commercial operation date of October 31, 2018.

Queue IDW3-003
Project nameQuakertown Solar Farm #1
Status (as published)In Service
SubstationEast Flemington-Frenchtown
Point of interconnectionEast Flemington-Frenchtown 34.5kV
CountyHunterdon
StateNJ
Voltage34.5 kV
Capacity0 MW (0 MW as filed — net change or energy-only)
Resource (as published)Solar
Resource categorySolar (normalized for filtering)
Target commercial operation2018-10-31
Source datasetserial

Same substation and county

Hunterdon, NJ: 89 requests in the PJM queue, 26 active totaling 863.1 MW.

Tracked changes

No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →

Additional filed fields

Project typeGeneration Interconnection
MW energy8.8
MW capacity0
MFO8.8

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.