PJM queue ID W2-080

Fisher Solar Farm (W2-080) is listed in the PJM interconnection queue as a 0.8 MW solar project in Hunterdon County, NJ. The filing names Stanton as its point of interconnection. PJM lists its status as “In Service”, with a target commercial operation date of June 25, 2017.

Queue IDW2-080
Project nameFisher Solar Farm
Status (as published)In Service
SubstationStanton
Point of interconnectionStanton 12kV
CountyHunterdon
StateNJ
Voltage12 kV
Capacity0.8 MW
Resource (as published)Solar
Resource categorySolar (normalized for filtering)
Target commercial operation2017-06-25
Source datasetserial

Same substation and county

Hunterdon, NJ: 89 requests in the PJM queue, 26 active totaling 863.1 MW.

Tracked changes

No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →

Additional filed fields

Project typeGeneration Interconnection
MW energy2
MW capacity0.8
MFO2

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.