South Boston Energy Facility

PJM queue ID W2-049

South Boston Energy Facility (W2-049) is listed in the PJM interconnection queue as a 47.4 MW project in Halifax County, VA. The filing names Reedy Creek as its point of interconnection. PJM lists its status as “In Service”, with a target commercial operation date of May 30, 2013.

Queue IDW2-049
Project nameSouth Boston Energy Facility
Status (as published)In Service
SubstationReedy Creek
Point of interconnectionReedy Creek 115kV
CountyHalifax
StateVA
Voltage115 kV
Capacity47.4 MW
Resource (as published)Biomass
Resource categoryOther (normalized for filtering)
Target commercial operation2013-05-30
Source datasetserial

Same substation and county

Halifax, VA: 57 requests in the PJM queue, 25 active totaling 1,315.8 MW.

Tracked changes

No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →

Additional filed fields

Project typeGeneration Interconnection
MW energy47.4
MW capacity47.4
MFO47.4

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.