Substation Scout

Paunch Solar

PJM queue ID W1-132

Paunch Solar (W1-132) is listed in the PJM interconnection queue as a solar request filed at 0 MW (a net change or energy-only filing) in Hunterdon County, NJ. The filing names Pittstown as its point of interconnection. PJM lists its status as “In Service”, with a target commercial operation date of June 30, 2014.

Queue IDW1-132
Project namePaunch Solar
Status (as published)In Service
SubstationPittstown
Point of interconnectionPittstown
CountyHunterdon
StateNJ
VoltageNot reported
Capacity0 MW (0 MW as filed — net change or energy-only)
Resource (as published)Solar
Resource categorySolar (normalized for filtering)
Target commercial operation2014-06-30
Source datasetserial

Same substation and county

Hunterdon, NJ: 89 requests in the PJM queue, 26 active totaling 863.1 MW.

Tracked changes

No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →

Additional filed fields

Project typeGeneration Interconnection
MW energy2
MW capacity0
MFO2

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first