Desert Wind Farm (W1-029) is listed in the PJM interconnection queue as a 27 MW wind project in Pasquotank County, NC. The filing names Winfall as its point of interconnection. PJM lists its status as “In Service”, with a target commercial operation date of December 31, 2020.

Queue IDW1-029
Project nameDesert Wind Farm
Status (as published)In Service
SubstationWinfall
Point of interconnectionWinfall 230kV
CountyPasquotank
StateNC
Voltage230 kV
Capacity27 MW
Resource (as published)Wind
Resource categoryWind (normalized for filtering)
Target commercial operation2020-12-31
Source datasetserial

Same substation and county

Pasquotank, NC: 5 requests in the PJM queue, 3 active totaling 48.6 MW.

Tracked changes

No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →

Additional filed fields

Project typeGeneration Interconnection
MW energy208
MW capacity27
MFO208

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first