Edgeboro
PJM queue ID V3-058
Edgeboro (V3-058) is listed in the PJM interconnection queue as a solar request filed at 0 MW (a net change or energy-only filing) in Middlesex County, NJ. The filing names Brunswick as its point of interconnection. PJM lists its status as “In Service”, with a target commercial operation date of October 1, 2010.
| Queue ID | V3-058 |
|---|---|
| Project name | Edgeboro |
| Status (as published) | In Service |
| Substation | Brunswick |
| Point of interconnection | Brunswick 26.4kV |
| County | Middlesex |
| State | NJ |
| Voltage | 26.4 kV |
| Capacity | 0 MW (0 MW as filed — net change or energy-only) |
| Resource (as published) | Solar |
| Resource category | Solar (normalized for filtering) |
| Target commercial operation | 2010-10-01 |
| Source dataset | serial |
Same substation and county
Brunswick substation: 6 requests in the PJM queue, 4 active totaling 153.8 MW.
| Queue ID | Project | MW | Resource | Status |
|---|---|---|---|---|
| C01-1016 | Brunswick 115 kV | 150 | Battery | Active |
| AB2-057 | New Road Solar | 3.8 | Solar | In Service |
| V3-059 | Edgeboro | 0 | Solar | In Service |
| Y2-097 | Brunswick 500kV | 1,376 | Gas | Withdrawn |
| AE2-287 | Brunswick 115 kV | 78 | Solar | Withdrawn |
Middlesex, NJ: 120 requests in the PJM queue, 33 active totaling 4,764.7 MW.
Tracked changes
No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →
Additional filed fields
| Project type | Generation Interconnection |
|---|---|
| MW energy | 2 |
| MW capacity | 0 |
| MFO | 2 |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.