Middle Pennisula Gas to Energy Power Plant

PJM queue ID T79

Middle Pennisula Gas to Energy Power Plant (T79) is listed in the PJM interconnection queue as a 6.2 MW gas project in Gloucester County, VA. The filing names Shacklefords as its point of interconnection. PJM lists its status as “In Service”, with a target commercial operation date of October 1, 2009.

Queue IDT79
Project nameMiddle Pennisula Gas to Energy Power Plant
Status (as published)In Service
SubstationShacklefords
Point of interconnectionShacklefords 34.5kv
CountyGloucester
StateVA
Voltage34.5 kV
Capacity6.2 MW
Resource (as published)Methane
Resource categoryGas (normalized for filtering)
Target commercial operation2009-10-01
Source datasetserial

Same substation and county

Shacklefords substation: 2 requests in the PJM queue, 2 active totaling 10.2 MW.

Queue IDProjectMWResourceStatus
W1-077King and Queen4GasIn Service

Gloucester, VA: 15 requests in the PJM queue, 7 active totaling 133.2 MW.

Tracked changes

No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →

Additional filed fields

Project typeGeneration Interconnection
MW energy6.2
MW capacity6.2
MFO6.2

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.