Gavin 1
PJM queue ID P61
Gavin 1 (P61) is listed in the PJM interconnection queue as a 20 MW coal project in Adams County, OH. The filing names Gavin #1 as its point of interconnection. PJM lists its status as “In Service”, with a target commercial operation date of January 1, 2010.
| Queue ID | P61 |
|---|---|
| Project name | Gavin 1 |
| Status (as published) | In Service |
| Substation | Gavin #1 |
| Point of interconnection | Gavin #1 765kV |
| County | Adams |
| State | OH |
| Voltage | 765 kV |
| Capacity | 20 MW |
| Resource (as published) | Coal |
| Resource category | Coal (normalized for filtering) |
| Target commercial operation | 2010-01-01 |
| Source dataset | serial |
Same substation and county
Adams, OH: 21 requests in the PJM queue, 4 active totaling 347 MW.
Tracked changes
No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →
Additional filed fields
| Project type | Generation Interconnection |
|---|---|
| MW energy | 20 |
| MW capacity | 20 |
| MFO | 1320 |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.
Site Scanner